milestone, audited, status, scores, gaps, tech_debt
milestone audited status scores gaps tech_debt
v1.0 2026-02-25 tech_debt
requirements phases integration flows
15/15 4/4 14/14 5/5
requirements integration flows
phase items
04-frontend
Frontend admin email hardcoded as literal in adminService.ts line 81 — should use import.meta.env.VITE_ADMIN_EMAIL for config parity with backend
phase items
02-backend-services
Dual retention cleanup: runRetentionCleanup (weekly, model-layer) overlaps with pre-existing cleanupOldData (daily, raw SQL) for service_health_checks and alert_events tables
index.ts line 225: defineString('EMAIL_WEEKLY_RECIPIENT') has personal email as deployment default — recommend removing or using placeholder
phase items
03-api-layer
Pre-existing TODO in jobProcessorService.ts line 448: 'Implement statistics method in ProcessingJobModel' — orphaned method, not part of this milestone
phase items
01-data-foundation
Migrations 012 and 013 must be applied manually to Supabase before deployment — no automated migration runner

Milestone v1.0 Audit Report

Milestone: CIM Summary — Analytics & Monitoring v1.0 Audited: 2026-02-25 Status: tech_debt (all requirements met, no blockers, accumulated deferred items)

Requirements Coverage (3-Source Cross-Reference)

REQ-ID Description VERIFICATION.md SUMMARY Frontmatter REQUIREMENTS.md Final
INFR-01 DB migrations create tables with indexes Phase 1: SATISFIED 01-01, 01-02 [x] satisfied
INFR-04 Use existing Supabase connection Phase 1: SATISFIED 01-01, 01-02 [x] satisfied
HLTH-02 Probes make real authenticated API calls Phase 2: SATISFIED 02-02 [x] satisfied
HLTH-03 Probes run on schedule, separate from processing Phase 2: SATISFIED 02-04 [x] satisfied
HLTH-04 Probe results persist to Supabase Phase 2: SATISFIED 02-02 [x] satisfied
ALRT-01 Email alert on service down/degraded Phase 2: SATISFIED 02-03 [x] satisfied
ALRT-02 Alert deduplication within cooldown Phase 2: SATISFIED 02-03 [x] satisfied
ALRT-04 Alert recipient from config, not hardcoded Phase 2: SATISFIED 02-03 [x] satisfied
ANLY-01 Processing events persist at write time Phase 2: SATISFIED 02-01 [x] satisfied
ANLY-03 Analytics instrumentation non-blocking Phase 2: SATISFIED 02-01 [x] satisfied
INFR-03 30-day retention cleanup on schedule Phase 2: SATISFIED 02-04 [x] satisfied
INFR-02 Admin API routes protected by Firebase Auth Phase 3: SATISFIED 03-01 [x] satisfied
HLTH-01 Admin can view live health status for 4 services Phase 3+4: SATISFIED 03-01, 04-01, 04-02 [x] satisfied
ANLY-02 Admin can view processing summary Phase 3+4: SATISFIED 03-01, 03-02, 04-01, 04-02 [x] satisfied
ALRT-03 In-app alert banner for critical issues Phase 4: SATISFIED 04-01, 04-02 [x] satisfied

Score: 15/15 requirements satisfied. 0 orphaned. 0 unsatisfied.

Phase Verification Summary

Phase Status Score Human Items
01-data-foundation human_needed 3/4 Migration execution against live Supabase
02-backend-services passed 14/14 Live deployment verification (probes, email, retention)
03-api-layer passed 10/10 None
04-frontend human_needed 4/4 code-verified Alert banner, health grid, analytics panel with live data

Cross-Phase Integration (14/14 wired)

All exports from every phase are consumed downstream. No orphaned exports. No missing connections that break functionality.

E2E Flows Verified (5/5)

  1. Health Probe Lifecycle (HLTH-01/02/03/04): Scheduler → probes → Supabase → API → frontend grid
  2. Alert Lifecycle (ALRT-01/02/03/04): Probe failure → dedup check → DB + email → API → banner → acknowledge
  3. Analytics Pipeline (ANLY-01/02/03): Job processing → fire-and-forget events → aggregate SQL → API → dashboard
  4. Retention Cleanup (INFR-03): Weekly scheduler → parallel deletes across 3 tables
  5. Admin Auth Protection (INFR-02): Firebase Auth → admin email check → 404 for non-admin

Tech Debt

Phase 4: Frontend

  • Admin email hardcoded (adminService.ts:81): ADMIN_EMAIL = 'jpressnell@bluepointcapital.com' — should be import.meta.env.VITE_ADMIN_EMAIL. Backend is config-driven but frontend literal would silently break if admin email changes. Security not affected (API-level protection correct).

Phase 2: Backend Services

  • Dual retention cleanup: runRetentionCleanup (weekly, model-layer) overlaps with pre-existing cleanupOldData (daily, raw SQL) for the same tables. Both use 30-day threshold. Harmless but duplicated maintenance surface.
  • Personal email in defineString default (index.ts:225): defineString('EMAIL_WEEKLY_RECIPIENT', { default: 'jpressnell@bluepointcapital.com' }) — recommend placeholder or removal.

Phase 3: API Layer

  • Pre-existing TODO (jobProcessorService.ts:448): TODO: Implement statistics method — orphaned method, not part of this milestone.

Phase 1: Data Foundation

  • Manual migration required: SQL files 012 and 013 must be applied to Supabase before deployment. No automated migration runner was included in this milestone.

Total: 5 items across 4 phases. None are blockers.

Human Verification Items (Deployment Prerequisites)

These items require a running application with live backend data:

  1. Run migrations 012 + 013 against live Supabase
  2. Deploy backend Cloud Functions (runHealthProbes, runRetentionCleanup)
  3. Verify health probes execute on schedule and write to service_health_checks
  4. Verify alert email delivery on probe failure
  5. Verify frontend monitoring dashboard renders with live data
  6. Verify alert banner appears and acknowledge works

Audited: 2026-02-25 Auditor: Claude (gsd audit-milestone)