Milestone v1.0 Audit Report
Milestone: CIM Summary — Analytics & Monitoring v1.0 Audited: 2026-02-25 Status: tech_debt (all requirements met, no blockers, accumulated deferred items)
Requirements Coverage (3-Source Cross-Reference)
| REQ-ID | Description | VERIFICATION.md | SUMMARY Frontmatter | REQUIREMENTS.md | Final |
|---|---|---|---|---|---|
| INFR-01 | DB migrations create tables with indexes | Phase 1: SATISFIED | 01-01, 01-02 | [x] | satisfied |
| INFR-04 | Use existing Supabase connection | Phase 1: SATISFIED | 01-01, 01-02 | [x] | satisfied |
| HLTH-02 | Probes make real authenticated API calls | Phase 2: SATISFIED | 02-02 | [x] | satisfied |
| HLTH-03 | Probes run on schedule, separate from processing | Phase 2: SATISFIED | 02-04 | [x] | satisfied |
| HLTH-04 | Probe results persist to Supabase | Phase 2: SATISFIED | 02-02 | [x] | satisfied |
| ALRT-01 | Email alert on service down/degraded | Phase 2: SATISFIED | 02-03 | [x] | satisfied |
| ALRT-02 | Alert deduplication within cooldown | Phase 2: SATISFIED | 02-03 | [x] | satisfied |
| ALRT-04 | Alert recipient from config, not hardcoded | Phase 2: SATISFIED | 02-03 | [x] | satisfied |
| ANLY-01 | Processing events persist at write time | Phase 2: SATISFIED | 02-01 | [x] | satisfied |
| ANLY-03 | Analytics instrumentation non-blocking | Phase 2: SATISFIED | 02-01 | [x] | satisfied |
| INFR-03 | 30-day retention cleanup on schedule | Phase 2: SATISFIED | 02-04 | [x] | satisfied |
| INFR-02 | Admin API routes protected by Firebase Auth | Phase 3: SATISFIED | 03-01 | [x] | satisfied |
| HLTH-01 | Admin can view live health status for 4 services | Phase 3+4: SATISFIED | 03-01, 04-01, 04-02 | [x] | satisfied |
| ANLY-02 | Admin can view processing summary | Phase 3+4: SATISFIED | 03-01, 03-02, 04-01, 04-02 | [x] | satisfied |
| ALRT-03 | In-app alert banner for critical issues | Phase 4: SATISFIED | 04-01, 04-02 | [x] | satisfied |
Score: 15/15 requirements satisfied. 0 orphaned. 0 unsatisfied.
Phase Verification Summary
| Phase | Status | Score | Human Items |
|---|---|---|---|
| 01-data-foundation | human_needed | 3/4 | Migration execution against live Supabase |
| 02-backend-services | passed | 14/14 | Live deployment verification (probes, email, retention) |
| 03-api-layer | passed | 10/10 | None |
| 04-frontend | human_needed | 4/4 code-verified | Alert banner, health grid, analytics panel with live data |
Cross-Phase Integration (14/14 wired)
All exports from every phase are consumed downstream. No orphaned exports. No missing connections that break functionality.
E2E Flows Verified (5/5)
- Health Probe Lifecycle (HLTH-01/02/03/04): Scheduler → probes → Supabase → API → frontend grid
- Alert Lifecycle (ALRT-01/02/03/04): Probe failure → dedup check → DB + email → API → banner → acknowledge
- Analytics Pipeline (ANLY-01/02/03): Job processing → fire-and-forget events → aggregate SQL → API → dashboard
- Retention Cleanup (INFR-03): Weekly scheduler → parallel deletes across 3 tables
- Admin Auth Protection (INFR-02): Firebase Auth → admin email check → 404 for non-admin
Tech Debt
Phase 4: Frontend
- Admin email hardcoded (
adminService.ts:81):ADMIN_EMAIL = 'jpressnell@bluepointcapital.com'— should beimport.meta.env.VITE_ADMIN_EMAIL. Backend is config-driven but frontend literal would silently break if admin email changes. Security not affected (API-level protection correct).
Phase 2: Backend Services
- Dual retention cleanup:
runRetentionCleanup(weekly, model-layer) overlaps with pre-existingcleanupOldData(daily, raw SQL) for the same tables. Both use 30-day threshold. Harmless but duplicated maintenance surface. - Personal email in defineString default (
index.ts:225):defineString('EMAIL_WEEKLY_RECIPIENT', { default: 'jpressnell@bluepointcapital.com' })— recommend placeholder or removal.
Phase 3: API Layer
- Pre-existing TODO (
jobProcessorService.ts:448):TODO: Implement statistics method— orphaned method, not part of this milestone.
Phase 1: Data Foundation
- Manual migration required: SQL files 012 and 013 must be applied to Supabase before deployment. No automated migration runner was included in this milestone.
Total: 5 items across 4 phases. None are blockers.
Human Verification Items (Deployment Prerequisites)
These items require a running application with live backend data:
- Run migrations 012 + 013 against live Supabase
- Deploy backend Cloud Functions (runHealthProbes, runRetentionCleanup)
- Verify health probes execute on schedule and write to service_health_checks
- Verify alert email delivery on probe failure
- Verify frontend monitoring dashboard renders with live data
- Verify alert banner appears and acknowledge works
Audited: 2026-02-25 Auditor: Claude (gsd audit-milestone)